← Back to sites

Canal Corridor North Development Site, Lancaster

not-permissionedDeliverable (5 years)

Site Details

Site Size
4.78 hectares
Potential Dwellings
330
Ownership
mixed-ownership
Reference
343

Location

Coordinates: 54.049833, -2.795684

View on interactive map →

Notes

Site has a draft allocation in the Strategic Policies and Land Allocations DPD, Publication Version. Expectation for student housing.. 08/00866/OUT - Comprehensive redevelopment comprising a retail led mixed used scheme to include demolition of existing buildings and associated structures, the demolition of all residential dwellings, the closure and alteration of highways, engineering w

Data source: Brownfield Land Register | Entry date: 15/02/2018 | Start date: 15/02/2018