Longcross Garden Village (northern site)
Site Details
- Site Size
- 28.00 hectares
- Potential Dwellings
- 108 - 200
- Ownership
- not-owned-by-a-public-authority
- Reference
- SLAA/99/1
Planning
- Permission Type
- hybrid application
- Permission Date
- 12/08/2014
Location
Coordinates: 51.382974, -0.592060
View on interactive map →Notes
Site north of M3 only: RU.13/0856 (Hybrid), Phase 2 RM: RU.17/1295, RU.17/1307 & RU.17/1191. Register entry contains dwellings remaining to be completed.. Hybrid planning application for the demolition of existing buildings and redevelopment of the site to provide; up to 79,025sqm (GEA) of Class B1 employment uses (including parking); up to 36,000sqm (GEA) of sui generis Data Centres use (including ancillary facilities and parking); up to 200 dwellings, including a detailed first phase comprising 108 dwellings (comprising 13 x two bed, 26 x three bed, 21 x four bed and 13 x five bed dwellings; 8 x one bed apartments and 23 x two bed apartments; and 2 x one bed FOGs and 2 x two bed FOGs); roadways driveways and pavements; fencing and walling; up to 6,300sqm (GEA) of ancillary uses, including Class A1 - A5 uses (i.e. retail uses, cafe/restaurants and a public house up to 1,550sqm GEA), Class D1 uses (i.e. childcare facilities up to 600sqm GEA); Class D2 uses (i.e. Health and Leisure (up to 1900sqm GEA); the creation of Publicly Accessible Open Space (PAOS), ecological habitats, general amenity areas ( including informal and formal open spaces), equipped play areas and landscaped areas; new vehicular accesses from the existing public highway network; vehicle and cycle parking; bin stores; landscape compound; car parking (for railway station); electricity sub-stations; lighting; drainage and associated infrastructure works, including sustainable drainage systems (SUDS); a foul pumping station; an acoustic fence and associated engineering and service operations
External Links
Data source: Brownfield Land Register | Entry date: 05/02/2021 | Start date: 02/02/2018