Sackville Trading Estate/Coal Yard Sackville Road

Brighton and Hove|South East
Planning ApprovedDeliverable within 5 yearsHazardous Substances Present

564

Potential Homes

1.8

Hectares

2020

Permission Year

Public

Ownership

About This Site

Sackville Trading Estate/Coal Yard Sackville Road is a brownfield development site covering 1.77 hectares in Brighton and Hove. The site has potential for up to 564 new homes.

The site has full planning permission, granted on 06/08/2020.

Planning Details

Status
permissioned
Permission Type
full planning permission
Permission Date
06/08/2020
Deliverable
Yes (within 5 years)
Reference
SHLAA0180

Additional Notes

BH2019/03548 Approved Aug 2020 commenced summer 2021. PPA Signed April 2017. Pre App discussions. The previous use of the proposed development site as a railway yard and industrial site presents a high risk of contamination that could be mobilised during construction to pollute controlled waters. The east and south sides of the site has some history of contaminative use and this is referenced in the RSK land contamination report of 4/8/17.

What is Brownfield Land?

Brownfield land is previously developed land that may be available for redevelopment. The government prioritises brownfield development over greenfield sites to protect countryside and make efficient use of existing infrastructure. Local authorities maintain Brownfield Land Registers to identify suitable sites for housing.

Data source: Brownfield Land Register (Local Authority) | Added: 05/12/2022