Tilling Green, Rye

Rother|South East
Awaiting PermissionDeliverable within 5 years

8

Potential Homes

0.3

Hectares

-

Permission Year

Public

Ownership

About This Site

Tilling Green, Rye is a brownfield development site covering 0.26 hectares in Rother. The site has potential for up to 8 new homes.

Planning Details

Status
not-permissioned
Deliverable
Yes (within 5 years)
Reference
RDCBLR0028

Additional Notes

This site is allocated in the Rye Neighbourhood Plan (adopted July 2019) for at least 20 dwellings and a replacement community centre (up to 500 sqm), with up to 10% being self/custom build subject to a number of criteria, for instance the design of new development shall be sympathetic to the building form and materials used in surrounding buildings and provide appropriate external amenity areas for both the dwellings and the community centre; the community centre is to be retained in-situ or replaced before the last dwelling is occupied and a flood risk assessment shall be demonstrating that the residential development is safe for its lifetime; lastly car parking should be provided according to appropriate standards. See Policy H3 of the Rye Neighbourhood Plan (https://www.rother.gov.uk/rye-neighbourhood-plan/). December 2024 - No changes.

What is Brownfield Land?

Brownfield land is previously developed land that may be available for redevelopment. The government prioritises brownfield development over greenfield sites to protect countryside and make efficient use of existing infrastructure. Local authorities maintain Brownfield Land Registers to identify suitable sites for housing.

Data source: Brownfield Land Register (Local Authority) | Added: 01/10/2024