Ground Plant, Nuttaberry, East the Water, Bideford

Planning ApprovedDeliverable within 5 years

96

Potential Homes

3.7

Hectares

2021

Permission Year

Public

Ownership

About This Site

Ground Plant, Nuttaberry, East the Water, Bideford is a brownfield development site covering 3.71 hectares. The site has potential for up to 96 new homes.

The site has outline planning permission, granted on 21/09/2021.

Planning Details

Status
permissioned
Permission Type
outline planning permission
Permission Date
21/09/2021
Deliverable
Yes (within 5 years)
Reference
BLR/BID/18

Additional Notes

Residential capacity of site originally considered through SHLAA SHA/BID/18. Site identified as a non-strategic housing site in North Devon and Torridge Local Plan 2011-2031 (Appendix 5). Outline permission (1/0041/2009/OUTM) granted 21.9.21. Residential

What is Brownfield Land?

Brownfield land is previously developed land that may be available for redevelopment. The government prioritises brownfield development over greenfield sites to protect countryside and make efficient use of existing infrastructure. Local authorities maintain Brownfield Land Registers to identify suitable sites for housing.

Data source: Brownfield Land Register (Local Authority) | Added: 05/10/2021